Reply to post: Re: OK, but why ....

Shocker: UK smart meter rollout is crap, late and £500m over budget

Persona

Re: OK, but why ....

@veti

"Load control? Unless the rollout is even dumber than I've heard, that's not done by cutting off power at the meter. It's done by selectively cutting off individual major loads, usually an immersion heater."

How could it possibly do that? The smart meter in on the wires coming from the company fuses and going into the consumer unit. It's all or nothing. You would need a smart consumer unit to selectively cut power to individual circuits.

All a smart meter can do (in the future) is allow power to be bought with an expensive high reliability tariff or a cheaper low reliability tarif that gets turned off when power demand exceeds supply.

POST COMMENT House rules

Not a member of The Register? Create a new account here.

  • Enter your comment

  • Add an icon

Anonymous cowards cannot choose their icon